UNIO ENERGY LTD (Companies House CRN 17525346) funds, builds, owns, and operates industrial gas turbine CHP systems, ISCC-certified green methanol plants, CMEC plastic recycling plants, and CITCC-financed modular liquid-cooled AI data centres under 15-to-20-year £1/yr Peppercorn Leases.

Host Capital Outlay: £0 Free Host Installation (100% UNIO / CITCC EPC Funded · £1/yr Peppercorn Lease) · Commercial Reserve Settlements powered by Stripe · Visa · Mastercard · BACS
Four Bankable Infrastructure Engines

Engineered for Industrial Hosts, Waste Operators & Landowners.

Every UNIO Energy deployment is structured on a special-purpose project vehicle or direct private-wire energy supply agreement. Source: UNIO Energy Commercial Deal Pack (Oct 2026).

Division 01 · Private-Wire CHP

UE-Series Gas Turbines (2 MW – 112 MW)

Full turnkey installation, OEM long-term service agreement (LTSA), and £0 capital outlay for the industrial host site.

  • • 30% Discount on heat (£33.60/MWh vs £48.00/MWh boiler baseline)
  • • 18% Discount on private-wire electricity vs grid import
  • • 87% Total CHP Efficiency on flagship UE-7 (6.85 MWe + 13 MWth)
  • • 31,000 t/yr CO₂ food/industrial-grade flue capture ready
Inspect UE-2 to UE-110 Lineup →
Division 02 · Ref UE/BIO/UK/2026/001–003

CFH Green Methanol 50/50 Joint Venture

High-temperature (>1,200°C) tar-free gasification converting 500 t/day (150,000 t/yr) waste wood & RDF into 50,000 t/yr ISCC-certified green methanol.

  • • £46.44m/yr steady-state JV gross revenue (£25.9m EBITDA)
  • • 50% Spot Gate Fee (£55/t RDF vs £110/t; £37.50/t wood vs £75/t)
  • • £6.94m/yr host disposal saving + £4.65m/yr 50% profit share
  • • ~2.5 Hectares on a 20-year £1/yr Peppercorn Lease
Review Green Methanol Waterfall →
Division 03 · Ref UE/PL/UK/2026/001–003

CMEC 80,000 t/yr Plastic Recycling JV

Turnkey EPC by CMEC SUZHOU (China Machinery Engineering Corporation, 1829.HK) processing 20 t/h mixed plastic waste into concrete-grade polymer & PRNs.

  • • £18.27m/yr gross revenue (£11.87m PRNs + £4.4m gate fees + £1.7m polymer)
  • • £4.40m/yr host gate-fee saving (50% of £110/t EfW/RDF spot)
  • • £3.78m/yr each 50/50 distributable net profit (£7.57m total net)
  • • ≥1.0 Hectare on a 15-year £1/yr Peppercorn Lease
Review CMEC Plastic JV Terms →
Division 04 · CITCC 85% EPC Finance

UNIO Data UD-Series Modular AI Centres

Factory-built liquid-cooled AI compute pods (250 kW to 2 MW) plus hyperscale data halls (Halo West Salford £250m / 56,000 sq ft & Peel Waters).

  • • 85% EPC Finance at 6% via CITCC (17,000+ staff, China Telecom Group)
  • • Only 15% Equity Required — £0 host borrowing, URDG 758 guarantees
  • • PUE 1.22–1.25 direct-to-chip liquid cooling (up to 40 kW/rack)
  • • GPDO Class M ~250 m² footprint for rapid campus deployment
Inspect UD-250 to UD-2000 Pods →
UE-Series Gas Turbine Schedule

Industrial Combined Heat & Power (2 MW to 112 MW).

All five UE-Series packages operate on natural gas, biomethane, flares, or hydrogen blends with dry low-NOx combustion and full heat-recovery steam generation (Source: UNIO_Energy_Brochure_Final.pdf).

Model Electrical Output Electrical Efficiency Thermal Output (CHP) Total CHP Efficiency Capturable CO₂ Primary Industrial Application
UE-2 2.00 MWe 21.0% ~6.0 MWth Steam / Hot Water 83.0% ~9,500 t/yr Food & beverage, distilleries, regional hospitals
UE-3 3.00 MWe 23.0% ~11.0 MWth Steam / Hot Water 85.0% ~14,200 t/yr Paper mills, greenhouses, pharmaceutical campuses
UE-7 (Flagship) 6.85 MWe (54.8 GWh/yr) 30.1% ~13.0 MWth (104 GWh/yr) 87.0% ~31,000 t/yr Heavy manufacturing, chemical plants, Green Methanol & Plastic JVs
UE-25 25.00 MWe 35.5% ~33.0 MWth High-Grade Steam 86.5% ~98,000 t/yr Refineries, district heating networks, hyperscale AI campuses
UE-110 112.00 MWe 35.1% ~158.0 MWth District / Process 86.0% ~420,000 t/yr Utility grid firming, industrial clusters, sovereign data parks
Contract-Backed 50/50 Joint Ventures

CFH Green Methanol & CMEC Plastic Recycling Waterfalls.

Structured under standardized three-contract packs: (001) Site Host & Services Agreement, (002) Peppercorn Lease (£1/yr), and (003) Revenue Sharing & Waterfall Agreement (Source: UNIO Legal Contract Packs).

Commercial Parameter CFH Green Methanol JV (Ref: UE/BIO/UK/2026/001–003) CMEC Plastic Recycling JV (Ref: UE/PL/UK/2026/001–003)
EPC & Technology Partner CFH High-Temperature (>1,200°C) Tar-Free Fluidised-Bed Gasification CMEC SUZHOU (China Machinery Engineering Corp, 1829.HK)
Annual Feedstock Volume 150,000 t/yr (500 t/day waste wood, compost oversize & RDF) 80,000 t/yr (20 t/h mixed residual plastic waste, 16 hrs/day × 250 days)
Primary Output & Offtake 50,000 t/yr ISCC-Certified Green Methanol + Vitrified Slag 68,000 t/yr Recycled Polymer (5–20 mm concrete aggregate) + 40,800 t PRNs
Host Gate-Fee Discount 50% of daily spot (£55/t RDF vs £110/t; £37.50/t wood vs £75/t) → £6.94m/yr saved 50% of daily spot (£55/t vs £110/t EfW/RDF spot) → £4.40m/yr saved
Steady-State Gross Revenue £46.44m / year (£25.90m EBITDA) £18.27m / year (£11.87m PRNs + £4.40m Tipping + £1.70m Polymer + £0.30m Carbon)
Distributable Net Profit (50/50) £9.31m / year (£4.65m/yr to Host + £4.65m/yr to UNIO Energy) £7.57m / year (£3.78m/yr to Host + £3.78m/yr to UNIO Energy)
Combined Annual Value to Host £11.60m / year (~£65m to Host over 12 years) £8.20m / year (~£51m to Host over 12 years)
UNIO Data · CITCC Turnkey EPC + 85% Construction Finance

UD-Series Modular AI Data Centres & Hyperscale Land JVs.

Delivered in partnership with CITCC (China International Telecommunication Construction Corporation) alongside a UK Tier 1 civils contractor. CITCC provides 85% of EPC cost as construction finance at 6% APR, requiring only 15% project equity (Source: UNIO_Data_UD_Series_Brochure.pdf & Peel Waters Proposal).

Module IT Load & Racks Cooling & PUE Turnkey EPC Cost CITCC 85% Finance (6%) 15% Equity Required Annual Revenue / Host Value
UD-250 Edge AI 250 kW · 13 Racks Liquid/Air Hybrid · PUE 1.28 £3.20m £2.72m £0.48m £1.02m Rev · £0.18m/yr Host Share
UD-500 Regional AI 500 kW · 20 Racks Direct Liquid · PUE 1.26 £5.90m £5.02m £0.88m £2.04m Rev · £0.36m/yr Host Share
UD-1000 Campus AI 1.0 MW · 25 × 40kW Racks Direct-to-Chip Liquid · PUE 1.25 £10.70m £9.10m £1.60m £4.08m Rev · £1.47m EBITDA · £0.72m/yr Host
UD-2000 Twin Hall 2.0 MW · 50 × 40kW Racks Direct-to-Chip Liquid · PUE 1.22 £20.20m £17.17m £3.03m £8.16m Rev · £3.10m EBITDA · £1.53m/yr Host
Hyperscale Campus (Halo West / Peel) 10 MW – 50 MW+ (56,000 sq ft+) UE-25/110 Private-Wire + Liquid Up to £250.0m 85% CITCC Debt Facility 15% SPV / Land Equity Bespoke Institutional Waterfall
Interactive Deal Modeller

Calculate Your Host-Site Savings & 50/50 JV Profit Share.

Select a UNIO Energy project structure and adjust your site capacity or annual waste tonnage to inspect live steady-state returns.

0.5x Scale 1.0x Reference Plant 4.0x Multi-Unit Campus
Host Capex Outlay
£0 (£1/yr Lease)
Project Gross Revenue
£12.00m/yr
Host Tariff / Gate Saving
£2.95m/yr
Total Annual Host Value
£2.95m/yr
Provenance: UE-7 CHP delivers 54.8 GWh/yr electricity (18% below grid tariff) and 104 GWh/yr steam/hot water (30% below £48/MWh gas boiler baseline), plus 31,000 t/yr capturable CO₂.
Direct Engineering & JV Intake

UNIO Energy Project Specification Form

Submit your site parameters to receive a formal feasibility pack, Peppercorn Lease heads of terms, and site-specific financial waterfall within 48 hours. Free assessment — £0 obligation.